In Australian plant hire, 'wet hire' usually means the machine comes with an operator (and often fuel and maintenance), while 'dry hire' means the machine only, run by your own people. The terms are used loosely, so always confirm exactly what is included. The right model depends on your crew, supervision capacity and appetite for risk.
Editorial planning guidance with illustrative scenarios. No independent professional review is claimed. Read the authorship and evidence policy or report a correction.
What each model usually includes
Wet hire commonly includes the machine, an experienced operator, routine servicing and sometimes fuel. The supplier manages the operator's employment, competency and much of the machine's upkeep. Dry hire provides the machine; you supply the operator, daily checks and often fuel, and you carry more responsibility for how it is used.
Some suppliers use 'wet' to mean including fuel. Put the inclusions in writing.
- Operator: included in wet, yours in dry
- Fuel: varies — confirm
- Servicing: usually supplier; daily checks often hirer in dry
- Damage and misuse: more exposure for the hirer in dry
When wet hire makes sense
Wet hire suits specialist machines your team does not run every day, short-term peaks in work, and situations where you cannot find or supervise suitable operators. It also moves some risk — operator competency, fatigue and much of the maintenance — to the supplier. Cranes in Australia are almost always wet hired.
When dry hire makes sense
Dry hire can be cheaper per hour and gives you direct control over the machine. It suits contractors with competent operators, established plant systems and enough utilisation to justify their own crew. You take on responsibility for operation, daily inspections and damage from misuse, so check your insurance.
Compare like with like
To compare a wet and a dry quote fairly, add your own costs to the dry rate: operator wages and on-costs, supervision, fuel, daily servicing, insurance and the risk of downtime. The cheaper hourly rate is not always the cheaper outcome.
Typical Australian pricing for each model
In Australia, wet hire is usually quoted as an hourly rate that includes the machine and operator, sometimes fuel, with a minimum number of hours per day. Dry hire is typically quoted per day, week or month with a daily hour allowance (often 8 hours) and an excess-hours rate beyond that. Long-term dry hire can be significantly cheaper per hour than short-term hire, which is why contractors with steady work often dry hire their core fleet on monthly terms.
The tables below give indicative ranges. They show why the comparison needs care: a 20 tonne excavator dry hired at around $1,800 per day with an operator costing $60–$80 per hour including on-costs can come out similar to wet hire — or cheaper — depending on utilisation, fuel and damage risk.
| Machine | Project quote |
|---|---|
| Excavator 5–8 t | Request a project-specific written quote |
| Excavator 12–14 t | Request a project-specific written quote |
| Excavator 20–25 t | Request a project-specific written quote |
| Excavator 30–36 t | Request a project-specific written quote |
| Excavator 45–50 t | Request a project-specific written quote |
| Dozer D6 class | Request a project-specific written quote |
| Dozer D8 class | Request a project-specific written quote |
| Grader 12–14 class | Request a project-specific written quote |
| Smooth-drum or pad-foot roller 10–12 t | Request a project-specific written quote |
| Articulated dump truck 30–40 t | Request a project-specific written quote |
| Water cart 13–15 kL | Request a project-specific written quote |
| Truck and dog | Request a project-specific written quote |
Dry hire rates and inclusions
Dry hire agreements typically require the hirer to carry damage waiver or insurance, perform daily checks, grease the machine and return it clean. Some suppliers charge a damage waiver fee as a percentage of the hire. Fuel is almost always the hirer's responsibility. Transport to and from site is usually extra.
| Machine | Project quote |
|---|---|
| Excavator 1.7–2 t | Request a project-specific written quote |
| Excavator 5–8 t | Request a project-specific written quote |
| Excavator 20–25 t | Request a project-specific written quote |
| Smooth-drum roller 10–12 t | Request a project-specific written quote |
| Boom lift 16–20 m (EWP) | Request a project-specific written quote |
| Telehandler 3–4 t | Request a project-specific written quote |
Responsibilities under WHS law
Under the model WHS laws, both the hirer and the supplier have duties. Suppliers must provide plant that is safe and maintained, with information on safe use. On dry hire, the hirer becomes responsible for how the plant is operated and inspected day to day, including ensuring operators are competent. On wet hire, the supplier employs the operator, but the principal contractor still controls the site and must coordinate safety. The contract should make these duties clear, but it cannot remove the legal duties themselves.
Worked comparison
Imagine a 20-tonne excavator offered at one hourly rate wet and a lower hourly rate dry. For the dry option, add your operator's wages and on-costs, supervision time, fuel if not included, daily servicing labour, insurance cover and the risk of paying for damage. Once those are included, the gap between the two rates often narrows or disappears.
The best choice depends on your circumstances. If you already have skilled, available operators and a good plant system, dry hire can save money. If not, wet hire may be cheaper overall and lower risk.
Questions to ask suppliers
Clarify these points before choosing between wet and dry quotes:
- Exactly what is included: operator, fuel, servicing, transport, attachments?
- What are the minimum hours and overtime rates?
- What insurance do you hold, and what excess applies to the hirer on dry hire?
- Who is responsible for daily checks and greasing?
Insurance on dry hire
Most suppliers require the hirer to insure dry-hired plant or pay a damage waiver. Check whether your contractor's plant insurance covers hired-in equipment, the excess that applies, and whether theft, fire, flood and rollover are covered. Without adequate cover, a single incident can cost far more than the hire itself.
Illustrative scenario: a council maintenance crew
A regional council has two experienced operators and steady drainage work for most of the year. It dry hires a 13-tonne excavator on a monthly rate and uses its own operators. For a six-week culvert replacement program with a tight deadline, it wet hires an additional 20-tonne excavator and operator, because it cannot free up another operator.
The monthly dry hire keeps its everyday cost low. The wet hire gives short-term capacity without adding staff. Both are compared on total cost, including the council's own labour, fuel and supervision.
Sample supplier brief
A short written brief gets faster, more comparable quotes. Adapt this example to your job:
“We need a 20-tonne excavator for about four months of drainage work near Bendigo, VIC. Please quote both options: dry hire on monthly terms with our own operator, and wet hire with your operator.”
“For dry hire, state the daily hour allowance, excess-hours rate, damage waiver or insurance requirements, and servicing arrangements. For wet hire, state minimum hours, overtime, standby and whether fuel is included. We will compare total monthly cost.”
Common questions
What does wet hire mean in Australia?
Usually hiring a machine with an operator supplied by the hire company. Some suppliers also include fuel. Always confirm inclusions in writing.
Is dry hire cheaper?
The hourly rate is usually lower, but you pay for the operator, fuel, daily servicing and carry more damage risk. Compare total costs, not rates.
Can I dry hire a crane?
Larger cranes are almost always supplied wet. Some smaller cranes and lifting equipment may be available dry to licensed operators.
This guide is general information to help you prepare a better enquiry. It is not engineering, legal or safety advice. Equipment selection, engineering and safe systems of work remain the responsibility of competent project and supplier teams, and regulatory requirements differ between states and sites.