The buying brief

Prepare a useful generator hire load brief

Give a generator supplier the load list, start sequence, operating hours and site constraints needed to propose a complete power package.

Generator selection starts with the equipment being powered, not a guess at a generator size. A clear load brief helps the supplier and qualified electrical team evaluate the demand and propose the right package. It also makes cables, distribution and fuel assumptions visible in the quote.

About this guide

Editorial planning guidance with illustrative scenarios. No independent professional review is claimed. Read the authorship and evidence policy or report a correction.

Build the equipment list

List each load with the manufacturer's electrical information, how often it runs and whether it operates at the same time as other equipment. Identify motors and other loads with starting characteristics the supplier needs to assess.

Where information is missing, label it as unknown rather than inventing a value. Send photographs of equipment plates to the responsible electrical team. The hire enquiry should gather evidence, not turn an estimated total into an electrical design.

Explain the operating pattern

Describe normal running, start-up sequence, shift hours and any periods with low demand. Ask the supplier how the proposed generator suits that pattern. A package intended for intermittent tools may differ from one supporting a continuous process.

State whether an interruption would stop the entire project or only one activity. If continuity matters, ask for a separate discussion of backup and changeover arrangements with qualified people. A second machine on a fleet list is not a continuity plan.

Example: adding a pump mid-hire

A generator originally powers site facilities, then the project proposes an additional pump. Before adding it, provide the pump data and operating sequence to the supplier and electrical team. Reassess the full package instead of assuming unused sockets mean available capacity.

The revised offer may change distribution, cabling, fuel or servicing requirements as well as generator size. Keep those changes together in the order so the delivery team is not working from the original incomplete equipment list.

Price the whole package

Ask for separate confirmation of distribution equipment, cables, installation responsibilities, fuel arrangements and service access. Provide the proposed location and any site constraints relating to noise, exhaust, deliveries or operating hours.

Have the qualified electrical team confirm connection, protection and installation requirements. Record who responds to faults and who can authorise changes. This guide supports the enquiry; it does not provide generator sizing or wiring instructions.

Separate continuous demand from starting behaviour

Illustrative situation: a site lists lighting, office equipment and a motor-driven pump. Adding nameplate running figures alone does not describe what happens when the pump starts or when several loads operate together. The supplier needs the load schedule and operating sequence, not a guessed generator size.

Include operating hours, fuel access, noise constraints, location and any critical loads in the enquiry. Ask what the offer includes beyond the generator: distribution equipment, commissioning, servicing and refuelling may be separate. Agree what happens when demand changes or a new load is added. This brief supports selection by qualified parties; it is not a sizing calculation. Retain the accepted load schedule so the hired package can be reviewed against the actual use rather than an informal list from the first phone call.

Decision record
CheckInformation neededNext action
Load scheduleEquipment ratings and electrical characteristicsHave a competent electrical person confirm the information
Starting sequenceWhich loads start together and howAsk the supplier to assess transient demand
DistributionConnection, cables and protectionAssign design and installation responsibilities

Common questions

Can I add all nameplate values to choose a generator?

Give the data to the supplier and qualified electrical team. Starting characteristics, operating patterns and the complete installation must be assessed.

Does generator hire include cables?

Only where the offer says so. Ask for distribution, cables, installation and fuel arrangements to be stated explicitly.

Field note

This guide is general information to help you prepare a better enquiry. It is not engineering, legal or safety advice. Equipment selection, engineering and safe systems of work remain the responsibility of competent project and supplier teams, and regulatory requirements differ between states and sites.