Temporary power supports remote camps, construction sites, shutdowns and emergencies. The right generator depends on load, duty cycle, fuel supply and whether units run in parallel for redundancy.
Provide the connected load, start-up loads for motors, run hours, fuel access and noise limits. Temporary electrical installations must be designed and connected by licensed electricians.
Start with a load schedule
List the equipment to be powered, manufacturer electrical information, operating pattern and simultaneous loads. Have the supplier and qualified electrical team assess the complete system. An estimated combined number alone is not a generator design.
Ask whether distribution, cables, installation, fuel and servicing are included. Describe the location and access for replenishment. If the load or operating schedule changes, obtain a revised assessment before treating the original package as sufficient.
Readiness check: request the proposed unit, transport configuration and support arrangements for your shift.
Power Generation Hire
Know before you call
Power Generation Hire questions
Useful starting points for a more productive supplier conversation.
What size generator do I need?
Add up connected loads and allow for motor start-up. A supplier or electrician can size it accurately.
Who connects a hire generator?
A licensed electrician must connect it to site electrical systems.
What should I include when requesting a quote?
List the equipment to be powered, manufacturer electrical information, operating pattern and simultaneous loads. Have the supplier and qualified electrical team assess the complete system. An estimated combined number alone is not a generator design. Request transport, attachments, included hours and the off-hire process in the same offer.
Are the listed machines available now?
These are published supplier categories, not live stock. Confirm the proposed unit, configuration, dispatch location and availability for your project dates directly with the supplier.